Should a roof be inspected before a waterproofing quotation is prepared?+
Yes. The substrate, cracks, drainage outlets, existing waterproofing layer and leakage locations should be inspected before selecting Polyurea, PU, sheet membrane or another suitable system.
Can property management companies and Owners’ Corporations make an enquiry?+
Yes. Please provide the building type, approximate roof area, leakage locations, photographs and whether a formal quotation document is required.
Can photographs be sent through WhatsApp for an initial assessment?+
Yes. Send an overall roof view together with close-ups of leakage points, drainage outlets, cracks and the existing waterproofing layer so we can assess whether a site inspection is required.
What can be reviewed in the project case galleries?+
The galleries show actual work areas, construction stages, waterproofing details and completed conditions, helping owners and property managers compare projects with similar requirements.
How do you choose between a Polyurea overlay and complete removal and reconstruction?+
The decision depends on adhesion of the existing membrane, substrate moisture, cracking, drainage falls and detail conditions. An overlay may be considered where the substrate remains sound; widespread failure, hollow areas or inadequate falls normally require complete reconstruction.
How is the cost of roof waterproofing calculated?+
Pricing is based on the work area, extent of removal, substrate repairs, detail work, material system, transport and site constraints. An accurate quotation can be prepared after the actual scope has been inspected.
How long does roof waterproofing normally take?+
The programme depends on the work area, substrate condition, required stages, curing time, weather and building operations. A suitable sequence can be proposed after the inspection.
What quality and maintenance records can be provided after completion?+
Depending on project requirements, we can organise progress photographs, material and work-stage records, testing or inspection information, completion documents and maintenance recommendations.