01 / Full removal
Full-removal roof waterproofing reconstruction
A full-removal rebuild may be assessed when existing layers have failed, the substrate needs repair or drainage falls require correction.
Decision note
Full removal is more than stripping a surface and recoating it. The removal scope is defined first, followed by substrate, drainage and detail repairs, then a waterproofing and protection system suited to the site. Testing and reinstatement must be agreed before quotation.

System fit
Confirm the existing condition before selecting the system.
- More suitable when
- Roofs with widespread layer failure or debonding, substrate defects, or drainage falls that need to be corrected.
- Do not assume suitability
- Where existing layers remain sound and the substrate, drainage and details are serviceable, full removal may not be the most proportionate option.
Detailed workflow
Six stages from survey to handover
- 01
Survey and define the scope
Inspect existing layers, cracks, hollow areas, outlets, upstands, plinths and leakage evidence, then record what must be removed or retained.
Checkpoint: Confirm area, access, equipment, drainage and operational restrictions.
- 02
Protect and phase the work
Plan work zones around building use and weather, protecting entrances, services, equipment and areas outside the contract scope.
Checkpoint: Confirm material access, waste removal and temporary weather protection.
- 03
Remove existing layers
Remove the waterproofing, screed or protection specified in the quotation and clear loose residue so the actual substrate can be assessed.
Checkpoint: Recheck concealed cracks, hollow areas and damage after exposure.
- 04
Repair substrate and drainage
Repair cracks, honeycombing and loose areas. Where included, address levels, falls and outlet details in line with the agreed proposal.
Checkpoint: Meet the selected system's strength, level and moisture requirements.
- 05
Rebuild waterproofing and details
Install the specified primer, waterproofing, protection or finish, with dedicated treatment at outlets, upstands, plinths and penetrations.
Checkpoint: Materials, thickness and application sequence follow the approved system.
- 06
Inspect, reinstate and hand over
Complete visual checks and suitable testing, reinstate finishes within scope, and compile photographs and handover records.
Checkpoint: Testing must suit the structure, drainage arrangement and site limits.
Project video
Full roof removal and reinstatement process
A site record covering removal, substrate preparation, waterproofing and final reinstatement.
Project evidence
Related construction records
Site assessment and quotation
First confirm whether full removal is necessary
Send roof overview, existing-layer and leakage photographs for an initial review before arranging a site inspection and project quotation.