Scope of works
Sheet-membrane waterproofing and junction details for below-ground structures
Aerial view of the Kai Lung Wan South public housing site with tower cranes, below-ground structures and roads beside the hillside

Project requirements

Project Overview

Kai Lung Wan South Public Housing Development is located in Pok Fu Lam, Southern District. The principal scope was sheet-membrane waterproofing and junction details for below-ground structures.

Below-ground waterproofing is coordinated with reinforcement, formwork and subsequent protection. Substrates and wall junctions are prepared before membrane laps, corners and terminations are covered by the next trade.

Sheet membranes, terminations and drainage protection are coordinated with the project drawings. Aerial photographs dated 30 September 2026 and close-ups from September and October document the site scale, below-ground structures and wall waterproofing progress.

Construction record

Arranged by work sequence
Aerial view of the Kai Lung Wan South public housing site with tower cranes, below-ground structures and roads beside the hillside
Site overview photographed on 30 September 202601 / 08
Closer aerial view of below-ground structures and reinforced walls at Kai Lung Wan South
Aerial view of below-ground structures and reinforcement zones02 / 08
Workers installing a dark sheet membrane around a below-ground opening at Kai Lung Wan South
Sheet-membrane installation at a below-ground structure03 / 08
Workers handling dark waterproofing material beside a concrete opening at Kai Lung Wan South
Below-ground waterproofing and detail work04 / 08
Worker wearing a Proficient WP uniform treating waterproofing seams and edges beside a concrete wall at Kai Lung Wan South
Proficient WP team treating wall waterproofing seams and edges05 / 08
Two Proficient WP workers installing dark wall sheet membranes from a work platform at Kai Lung Wan South
Proficient WP team installing wall sheet membranes06 / 08
Worker wearing a Proficient WP uniform preparing black dimpled drainage protection panels in the wall passage at Kai Lung Wan South
Proficient WP team preparing wall drainage protection panels07 / 08
Close-up of black dimpled drainage protection on the lower concrete wall and its horizontal upper termination at Kai Lung Wan South
Drainage protection panels and upper termination record08 / 08