Project case

Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre

Building type
Nature conservation and education facility
Project type
Property Development
District
Tai Po
Scope of works
Comprehensive waterproofing works from foundations to roof level
Aerial top-down view of the Kadoorie Farm Conservation Centre work site, showing the building layout, surrounding roads and greenery

Engineering record

Project background and problem

The humid valley setting, multiple substrate types and root-protection requirements had to be coordinated within one development.

Principal scope of works

  • 01Foundation and retaining-wall waterproofing
  • 02Planted-area and external-detail treatment
  • 03Roof, terrace and drainage-location waterproofing

System or material approach

Waterproofing systems selected for the foundations, walls, planted areas and roof substrates.

Inspection, acceptance or project records

The existing public record includes photographs of different work locations and stages. No independently publishable test report was found in the project source.

Updated
Content owner
Proficient Waterproofing & Engineering Ltd.
Reviewed by
Proficient Waterproofing Technical Team

This page was reviewed against existing public case records, site photographs and verifiable project information. Contract tests, acceptance, warranty and completion dates are stated only when public evidence is available.

Project requirements

Project Overview

Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre is located in Tai Po. The principal scope was comprehensive waterproofing works from foundations to roof level. The works also addressed high humidity in a valley setting and root-protection requirements.

The approximately 12,000 m² development included foundations, retaining walls, roofs, terraces and related details, with waterproofing systems selected for the different substrates.

Root resistance and drainage were coordinated at planted and external areas so the waterproofing system could support the subsequent landscape use.

Construction record

Arranged by work sequence
Worker applying a dark coating along a structural edge beside steel reinforcement and timber formwork at the Kadoorie Farm conservation centre
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0101 / 08
Worker using a long-handled roller on a black wall inside a concrete space at the Kadoorie Farm conservation centre
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0202 / 08
Elevated view of the multi-level construction site and surrounding woodland at the Kadoorie Farm conservation centre
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0303 / 08
Aerial top-down view of the Kadoorie Farm Conservation Centre work site, showing the building layout, surrounding roads and greenery
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0404 / 08
Two workers on a sloping podium facing the valley at the Kadoorie Farm conservation centre
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0505 / 08
Worker using a long-handled roller on a white floor beneath exposed indoor services at the Kadoorie Farm conservation centre
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0606 / 08
Worker spray-applying a white coating to the floor inside a concrete enclosure at the Kadoorie Farm conservation centre
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0707 / 08
Two workers positioning black sheets across a divided roof area with wooded hills behind at the Kadoorie Farm conservation centre
Kadoorie Farm and Botanic Garden – Jockey Club Nature Conservation Centre site record 0808 / 08