Engineering record
Project background and problem
Roof perimeters, wall junctions, drainage and equipment surroundings required continuous treatment after substrate preparation.
Principal scope of works
- 01Records of campus roof areas and existing conditions
- 02Grinding, local repairs and main waterproofing
- 03Verification of roof perimeters, equipment and completed surfaces
System or material approach
The works included grinding and local repairs, main waterproofing, and detail treatment at roof edges and around equipment.
Inspection, acceptance or project records
Published records progress from the campus and roof overview to substrates, site personnel, details and completed surfaces, supporting checks of coverage and drainage.
Project requirements
Project Overview
Hong Kong Baptist University is located in Kowloon Tong. The principal scope was university-campus roof waterproofing.
Records begin with the campus building and roof overview before showing existing conditions, grinding, local repairs and main waterproofing works.
Close-up views cover roof perimeters, wall junctions and equipment, while completion records verify membrane coverage, continuity and drainage points.
Construction record
Construction Photographs