Project case

Vertical SQ

Project type
Commercial & Industrial
Location
28 Heung Yip Road, Wong Chuk Hang
Scope of works
Grade-A commercial-building waterproofing
Low-angle exterior view of the glass-fronted Vertical SQ tower in Wong Chuk Hang against a blue sky

Project requirements

Project Overview

Vertical SQ is located in 28 Heung Yip Road, Wong Chuk Hang. The principal scope was grade-A commercial-building waterproofing.

Roof equipment, pipework and connections at different levels required zoned works that retained access while the building remained operational.

The gallery records substrate preparation, local repairs, main waterproofing and terminations at wall junctions and equipment.

Construction record

Arranged by work sequence
Close view of the high-rise exterior wall at Vertical SQ in Wong Chuk Hang, showing vertical marks and a suspended cradle near the top
Vertical SQ Waterproofing Project Stage 101 / 08
Two workers adjusting a suspended-cradle support and metal rail at the roof edge of Vertical SQ in Wong Chuk Hang
Vertical SQ Waterproofing Project Stage 202 / 08
Two workers in a suspended cradle working beside the grey facade and louvres of Vertical SQ in Wong Chuk Hang
Vertical SQ Waterproofing Project Stage 303 / 08
Suspended cradle outside the upper floors of Vertical SQ in Wong Chuk Hang, with two workers on the platform and hills behind
Vertical SQ Waterproofing Project Stage 404 / 08
Two workers operating a control box and inspecting the facade edge from a suspended platform at Vertical SQ in Wong Chuk Hang
Vertical SQ Waterproofing Project Stage 505 / 08
High-angle view of a suspended cradle at Vertical SQ in Wong Chuk Hang, with two workers on the platform and rooftops below
Vertical SQ Waterproofing Project Stage 606 / 08
Two workers organising ropes and tools beside a suspended cradle parked on the Vertical SQ roof in Wong Chuk Hang
Vertical SQ Waterproofing Project Stage 707 / 08
Low-angle exterior view of the glass-fronted Vertical SQ tower in Wong Chuk Hang against a blue sky
Vertical SQ Waterproofing Project Stage 808 / 08