Project case
Tai Wai Data Centre
- Building type
- Large data-centre construction site
- Project type
- Property Development
- District
- Tai Wai
- Scope of works
- Large-site roof and waterproofing records

Engineering record
Project background and problem
The data-centre roof works combined concrete removal, structural junctions, temporary protection and coordination with other contractors, requiring clearly defined work zones.
Principal scope of works
- 01Removal of existing concrete and substrate cleaning
- 02Structural perimeters, roof junctions and temporary protection
- 03Large-area waterproofing and aerial site records
System or material approach
Existing concrete and substrates were prepared before waterproofing the main roof areas, structural perimeters and junctions.
Inspection, acceptance or project records
Published photographs record removal, substrates, structural junctions, temporary protection and the large-area work environment. Contract test results are not stated.
Project requirements
Project Overview
Tai Wai Data Centre is located in Tai Wai. The principal scope was large-site roof and waterproofing records.
The large construction site required clear records of roof areas, temporary protection and coordination with other contractors.
The project demonstrates waterproofing capability within a large and technically demanding construction environment, beyond residential repair work.
Construction record
Construction Photographs