Scope of works
Waterproofing for below-ground structures, roofs and junction details
Aerial view of the Po Shek Wu Road public housing site in Sheung Shui with below-ground structures, cranes, roads and neighbouring homes

Project requirements

Project Overview

Po Shek Wu Road Public Housing Development, Sheung Shui is located in Po Shek Wu Road, Sheung Shui. The principal scope was waterproofing for below-ground structures, roofs and junction details.

Waterproofing for a large new development is coordinated across horizontal surfaces, walls, roofs and channels, with continuity at structural junctions, internal corners and upstands.

The project brief includes sheet-membrane, liquid-applied and cementitious systems. Close-ups of the below-ground works accompany aerial photographs dated 17 September 2026 to document substrates, wall junctions and waterproofing locations.

Construction record

Arranged by work sequence
Aerial view of the Po Shek Wu Road public housing site in Sheung Shui with below-ground structures, cranes, roads and neighbouring homes
Site overview photographed on 17 September 202601 / 08
Closer aerial view of reinforcement, formwork and below-ground construction zones at Po Shek Wu Road
Aerial view of below-ground structures, slabs and work zones02 / 08
Concrete wall at Po Shek Wu Road showing several darker local repair areas
Concrete wall and repair areas before waterproofing03 / 08
Prepared wall-to-floor junction at Po Shek Wu Road with a curved mortar cove
Substrate preparation at the wall-to-floor junction04 / 08
Gloved hand holding a wet-film thickness gauge against the dark waterproofing surface at Po Shek Wu Road
Close-up of a wet-film thickness gauge used on the waterproofing layer05 / 08
Dark waterproofing layer continuing across the internal wall-to-floor junction at Po Shek Wu Road
Wall-to-floor waterproofing junction06 / 08
Dark wall waterproofing at Po Shek Wu Road with lighter strips along the upper termination and vertical junction
Close-up of wall membrane and termination details07 / 08
Installed dark wall waterproofing, upper termination and exposed reinforcement at Po Shek Wu Road
Wall waterproofing progress in September 202608 / 08