Project case

Stadium Road, Prince Edward

Building type
Urban residential building
Project type
Residential
District
Kowloon
Scope of works
Residential-building roof waterproofing
Two workers treating the base of a roof parapet at Stadium Road, Prince Edward, Kowloon, where the wall surface is flaking and mottled

Engineering record

Project background and problem

Existing finishes, local leakage, outlets and pipe penetrations required individual treatment before the main roof waterproofing.

Principal scope of works

  • 01Inspection of the existing roof, outlets and pipe penetrations
  • 02Substrate repairs, wall terminations and main waterproofing
  • 03Drainage and completed-surface verification

System or material approach

Substrate repairs were followed by wall-junction, outlet and pipe-detail treatment, then the main waterproofing layer.

Inspection, acceptance or project records

Published photographs record the original roof, substrate repairs, details and completed surfaces for checking coverage, terminations and drainage.

Updated
Content owner
Proficient Waterproofing & Engineering Ltd.
Reviewed by
Proficient Waterproofing Technical Team

This page was reviewed against existing public case records, site photographs and verifiable project information. Contract tests, acceptance, warranty and completion dates are stated only when public evidence is available.

Project requirements

Project Overview

Stadium Road, Prince Edward is located in Kowloon. The principal scope was residential-building roof waterproofing.

Photographs record existing roof finishes, local leakage, drainage outlets and pipe penetrations before showing substrate repairs and waterproofing.

Works were divided around roof equipment and resident access, with completion records verifying main coverage, wall terminations and drainage.

Construction record

Arranged by work sequence
Three workers using hoses and spray equipment on the roof and parapet at Stadium Road, Prince Edward, Kowloon
Stadium Road, Prince Edward project record 0101 / 06
Elevated view of two workers using hoses to apply a light grey surface on the Stadium Road roof in Prince Edward, Kowloon
Stadium Road, Prince Edward project record 0202 / 06
Worker using a roller on a narrow tiled area beside the parapet at Stadium Road, Prince Edward, Kowloon
Stadium Road, Prince Edward project record 0303 / 06
Worker using a roller to apply a light grey surface around a circular roof drain at Stadium Road, Prince Edward, Kowloon
Stadium Road, Prince Edward project record 0404 / 06
Worker using a hand tool on an exterior wall beside a pipe within scaffolding at Stadium Road, Prince Edward, Kowloon
Stadium Road, Prince Edward project record 0505 / 06
Two workers treating the base of a roof parapet at Stadium Road, Prince Edward, Kowloon, where the wall surface is flaking and mottled
Stadium Road, Prince Edward project record 0606 / 06