Project case

No. 3 Middle Gap Road

Building type
High-end private-residential development
Project type
Property Development
District
The Peak
Scope of works
Luxury-residential development waterproofing
Top-down view of the roof, curved road and surrounding trees at No. 3 Middle Gap Road, The Peak

Engineering record

Project background and problem

In the humid and mist-prone Peak environment, the approximately 3,000 m² project combined a pool, external walls, a basement car park and multiple flat roofs that required zoned coordination.

Principal scope of works

  • 01Waterproofing to the swimming pool, external walls and basement car park
  • 02Treatment to multiple flat roofs and structural junctions
  • 03Zoned records for the high-humidity Peak environment

System or material approach

Waterproofing was arranged by structure and substrate across the pool, external walls, car park, flat roofs and junction details.

Inspection, acceptance or project records

Published photographs are arranged by structure and external area, recording the different work faces and completed conditions. Contract test results are not stated.

Updated
Content owner
Proficient Waterproofing & Engineering Ltd.
Reviewed by
Proficient Waterproofing Technical Team

This page was reviewed against existing public case records, site photographs and verifiable project information. Contract tests, acceptance, warranty and completion dates are stated only when public evidence is available.

Project requirements

Project Overview

No. 3 Middle Gap Road is located in The Peak. The principal scope was luxury-residential development waterproofing. The works also addressed detailed construction and sequencing for a high-end residential project.

Persistent humidity and mist at the Peak increased the demands on water resistance and durability, requiring substrate and termination details tailored to each structural location.

Records are arranged by structure and external area, documenting waterproofing coordination and completed conditions across multiple work faces.

Construction record

Arranged by work sequence
Aerial view of the residential site at No. 3 Middle Gap Road, with green scaffold netting and surrounding woodland
No. 3 Middle Gap Road project record 0101 / 05
Top-down view of the roof, curved road and surrounding trees at No. 3 Middle Gap Road, The Peak
No. 3 Middle Gap Road project record 0202 / 05
Worker on bamboo scaffolding applying a dark coating to an external wall at No. 3 Middle Gap Road
No. 3 Middle Gap Road project record 0303 / 05
Two workers positioning black textured sheeting beside a wall base and large pipe at No. 3 Middle Gap Road
No. 3 Middle Gap Road project record 0404 / 05
Worker spray-applying a grey surface along a ground edge beneath green scaffold netting at No. 3 Middle Gap Road
No. 3 Middle Gap Road project record 0505 / 05