Project case

Kwu Tung

Building type
Plant-room roof
Project type
Property Development
District
North District
Scope of works
Plant-room roof waterproofing
Two workers on a Kwu Tung plant-room roof with broad fields and hills in the background.

Engineering record

Project background and problem

A plant-room roof project covering the original substrate, parapets, drainage points and equipment details.

Principal scope of works

  • 01Inspection of plant-room roof substrate and cracks
  • 02Detail treatment at parapets, outlets and equipment
  • 03Main waterproofing application and completed-surface records

System or material approach

Works to the main plant-room roof, parapets, outlets and equipment details, using only the existing public case scope.

Inspection, acceptance or project records

Published site photographs are arranged by work stage and location. Contract tests, acceptance criteria and warranty terms remain subject to the project documents.

Updated
Content owner
Proficient Waterproofing & Engineering Ltd.
Reviewed by
Proficient Waterproofing Technical Team

This page was reviewed against existing public case records, site photographs and verifiable project information. Contract tests, acceptance, warranty and completion dates are stated only when public evidence is available.

Project requirements

Project Overview

Kwu Tung is located in North District. The principal scope was plant-room roof waterproofing.

Photographs begin with the original roof condition and record the main substrate treatment, waterproofing application and details at wall junctions, outlets and equipment.

The records are arranged by work sequence so treated locations can be identified during future inspections and maintenance.

Construction record

Arranged by work sequence
Elevated view of two workers on a plant-room roof in Kwu Tung, surrounded by fields.
Kwu Tung project record 0101 / 08
Wide view of a Kwu Tung plant room with workers on the roof and farmland surrounding the building.
Kwu Tung project record 0202 / 08
Overhead view of three workers and hoses across contrasting light and dark areas of a Kwu Tung plant-room roof.
Kwu Tung project record 0303 / 08
Elevated view of four workers across the pale perimeter and darker centre of a rectangular plant-room roof in Kwu Tung.
Kwu Tung project record 0404 / 08
Two workers on a Kwu Tung plant-room roof with broad fields and hills in the background.
Kwu Tung project record 0505 / 08
High aerial view of a small plant-room building beside roads and fields in Kwu Tung.
Kwu Tung project record 0606 / 08
Overhead view of two workers handling long hoses across light and dark roof areas at a Kwu Tung plant room.
Kwu Tung project record 0707 / 08
Elevated view of workers on a Kwu Tung plant-room roof with roads, fields and residential towers in the distance.
Kwu Tung project record 0808 / 08