Project case
Hung Wan Industrial Building, Kwun Tong
- Building type
- Industrial building
- Project type
- Commercial & Industrial
- District
- Kwun Tong
- Scope of works
- Industrial-building roof-waterproofing refurbishment

Engineering record
Project background and problem
The failed existing waterproofing on an approximately 620 m² roof at 63–65 Hung To Road required removal of finishes down to the structural substrate.
Principal scope of works
- 01Removal of existing finishes and concrete-substrate repairs
- 02Coves, water-stop channels and liquid-applied waterproofing
- 03Insulation protection and concrete-tile reinstatement
System or material approach
Concrete repair, new coves and water-stop channels, liquid-applied membrane, insulation and protection, followed by concrete-tile reinstatement.
Inspection, acceptance or project records
Photographs record removal, structural substrate, details, waterproofing, insulation/protection and tile reinstatement by stage.
Project requirements
Project Overview
Hung Wan Industrial Building, Kwun Tong is located in Kowloon. The principal scope was industrial-building roof-waterproofing refurbishment. The works also addressed complete removal of the failed build-up and reinstatement of protection and finishes.
The approximately 620 m² roof at 63–65 Hung To Road had a failed waterproofing system. Works began with removal of finishes back to the structural substrate.
Concrete repairs, new coves and water-stop channels, a liquid-applied membrane, insulation protection and concrete-tile reinstatement formed a complete roof-refurbishment sequence.
Construction record
Construction Photographs