Project case

Baguio Villa, Pok Fu Lam

Project type
Residential
Location
Pok Fu Lam
Scope of works
Residential-estate roof waterproofing
Low-angle view of multiple residential towers at Baguio Villa, Pok Fu Lam, with scaffolding on one facade

Project requirements

Project Overview

Baguio Villa, Pok Fu Lam is located in Pok Fu Lam. The principal scope was residential-estate roof waterproofing.

Timber decking, existing tiles and associated finishes were removed before the original substrate was inspected, repaired and prepared for a new conventional roof-waterproofing system.

Finishes were reinstated after waterproofing, with locations and connections reserved for the solar installation to reduce the risk of later damage to the membrane.

Construction record

Arranged by work sequence
Worker using a handheld power tool on a weathered rooftop surface at Baguio Villa, Pok Fu Lam
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 101 / 08
Equipment base with exposed bolts on a dark gridded rooftop surface at Baguio Villa, Pok Fu Lam
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 202 / 08
Vertical aerial view of a small Baguio Villa rooftop with debris piles and construction materials
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 303 / 08
Overhead aerial view of a cleared rectangular roof with pale surface areas and a dark perimeter at Baguio Villa
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 404 / 08
Baguio Villa rooftop covered with blue boards held down by sandbags and construction materials
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 505 / 08
Overhead aerial view of a light grey Baguio Villa rooftop with striped sheeting and construction materials
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 606 / 08
Close view of blue rooftop boards weighted with sandbags, pipes and blocks at Baguio Villa
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 707 / 08
Low-angle view of multiple residential towers at Baguio Villa, Pok Fu Lam, with scaffolding on one facade
Baguio Villa, Pok Fu Lam Waterproofing Project Stage 808 / 08